Of the 4 Volumes of Guide Books designed to assist users of NEC contracts, where Volume 1 and Volume 3 are common to all contracts this document is the Volume 4 specific to management of a contract based on the NEC4 Engineering and Construction Contract (ECC4). It is essential reading for those tasked with administering contracts based on the ECC4. Those preparing an ECC4 contract should use the Volume 2 specific to the preparation of an ECC4 contract.
Weight | 0.8 kg |
---|
Chapter 1 Introduction
Engineering and construction subcontract (ECS)
Chapter 2 Core and main Option clauses
1 General
2 The Contractor’s main responsibilities
3 Time
4 Quality management
5 Payment
6 Compensation events
7 Title
8 Liabilities and insurance
9 Termination
Chapter 3 Clauses for resolving and avoiding disputes
Chapter 4 Secondary Option clauses
Option X1: Price adjustment for inflation (used only with Options A, B, C and D)
Option X2: Changes in the law
Option X3: Multiple currencies (used only with Options A and B)
Option X4: Ultimate holding company guarantee
Option X5: Sectional Completion
Option X6: Bonus for early Completion
Option X7: Delay damages
Option X8: Undertakings to the Client or Others
Option X9: Transfer of rights
Option X10: Information Modelling
Option X11: Termination by the Client
Option X12: Multiparty collaboration (not used with Option X20)
Option X13: Performance bond
Option X14: Advanced payment to the Contractor
Option X15: The Contractor’s design
Option X16: Retention (not used with Option F)
Option X17: Low performance damages
Option X18: Limitation of liability X18
Option X20: Key Performance Indicators (not used with Option X12)
Option X21: Whole life cost
Option X22: Early Contractor Involvement (used only with Options C and E)
Option Y(UK)1: Project Bank Account
Option Y(UK)2: The Housing Grants, Construction and Regeneration Act 1996
Option Y(UK)3: The Contract (Rights of Third Parties) Act 1999
Chapter 5 Schedule of Cost Components (SCC)
Chapter 6 Short Schedule of Cost Components (SSCC)
Appendix 1 Contract start-up checklist
Appendix 2 Contract close down checklist
Appendix 3 Example communication forms
Appendix 4 Example joint compensation event tracking schedule
Appendix 5 Example quotation of a compensation event